Product Description
Note: With many years of experience and development, SINOMAC has obtained the full capacity to offer complete and professional Turnkey Projects for you. It is quite worhty of your choice. Welcome to vist and consult.
General Features and Working Curve
The whole operation process of SINOMAC Glass Autoclave has 6 segments. Pre-heating and pre-pressing segment, first segment of temperature and pressure keeping, heating and pressurizing segment, second segment of temperature and pressure keeping, cooling segment, air exhaust segment. During the whole process, temperature and pressure in all segments will be monitored by HIM or PC, and the operation process will be realized by our exclusively developed TPC(Thermal Processing Control)software which is based on PLC control system to ensure the full automatic operation.
Detailed Photos
Product Parameters
Autoclave Specification
MODEL#SN-BGF2650 GLASS AUTOCLAVE_TECHNICAL PARAMETER |
No. |
Description |
Unit |
Specifications and Parameters |
1 |
Inner Diameter |
mm |
2650 |
2 |
Working Length |
mm |
5000 |
3 |
Max. Glass Size |
mm |
2300X5000 |
4 |
Autoclave Track Distance |
mm |
900 |
5 |
Track Height |
mm |
450 |
6 |
Design Pressure |
Mpa |
1.5 |
7 |
Design Temperature |
ºC |
160 |
8 |
Working Pressure |
Mpa |
1.3 |
9 |
Working Temperature |
ºC |
150 |
10 |
Safety Valve Exhaust |
Mpa |
1.4 |
11 |
Working Medium |
--- |
Compressed Air |
12 |
Heating Mode |
--- |
Electric(Convection+Radiation) |
17 |
Heater |
--- |
Inconel Tubular Heaters |
18 |
Heating Power |
KW |
135 |
19 |
Circulating Fan Motor Power |
KW |
18.5 |
20 |
Thermocouple type |
--- |
K or PT100 |
21 |
Air Temperature Thermocouples |
Piece |
3 |
23 |
Pressure Transducer |
Piece |
1 |
24 |
Vaccum Lines |
Piece |
---- |
25 |
Control Mode |
--- |
PLC+PC |
26 |
Control Software |
--- |
Thermal Processing Control (TPC) |
23 |
Insulation |
--- |
Internal |
24 |
Supporting Air Tank |
M³ |
1 |
25 |
Working Environment Temperature |
ºC |
Min. -20ºC, max.+45ºC |
26 |
Working Environment Humidity |
--- |
< 60% |
27 |
Power Supply |
--- |
220/380VAC, 3P+N+PE, 50/60Hz |
28 |
Weight |
KG |
14980 |
From the SINOMAC team, with 15 years of experience.
1. Quick opening door
- The whole system consists of three parts: A pair of gear flange, driven devices and seal ring.
- Hydraulically operated door opening and closing.
- The seal ring is made of silicon rubber.
2. Insulation system
- Insulation: Inner insulation
- Insulation material: Aluminium silicate+ rock wool
- Internal sheet metal: Stainless steel, 0.8 mm
- Insulation thickness: 80mm
3. Floor supports and rails
- Rail loading: 20,000kg, Increased loading can be offered optionally.
- Rail type: Unequal angle steel
- Floor loading: 400kg, Increased loading can be offered optionally.
- Form of floor supports: Mild Steel Checkered Plate
4. Heating system
- The heating system consists of the main heating zone and auxiliary heating zone, the heating element located in the rear and sides of the wind duct to ensure uniformity of temperature during the heating process.
- Electric heating via inconel tubular heaters
5. Cooling system (heating exchange)
- The main heating exchanger is made of Aluminum finned tube, which located in the rear of the autoclave.
- The auxiliary cooling system is made of Aluminum finned tube. Exchanger mounted in side wall for easy system maintenance.
6. Forced convection system
- Parameters of circulating fan
Power: 18.5KW,
Connecting format: Direct-connected,
Rated rotate speed: 960 r/min(400V/50HZ),
Fan wheel: 7# centrifugal impeller,
Wind pressure: 1100Pa,
Flowrate: 14400M3/h.
- Shaft sealing
Mechanical seal, silicon carbide - graphite materials as static and dynamic ring seal, bearings with high-temperature series.
7. Temperature monitoring components
- Air temperature thermocouples: 3, PT100, including HMI monitoring, data-acquisition, and control
- Hi-limit thermocouple: 1, PT100, including HMI monitoring/control.
8. Vacuum system
Vacuum source ports: 6 total
9. Control System
- Control System is developed based on the research and development toward glass processing industry, including the PLC central controlling part, touch screen (HIM) operation system and network. The operation of the whole system is based on the exclusive developed TPC (Thermal Processing Control )software.
- It can insert or save the production technique process, display the pressure and temperature curve anytime; And its paperless record function can realize record, save and check of technique curve and process parameters.
- Advanced TPC control software makes the controlling technique during the process of temperature waiting for pressure, pressure waiting for temperature possible to ensure the simultaneous effect of temperature and pressure according to the settled technique curve, and it also has over-temperature and overpressure alarm and various safety protection functions.
- Customer can operate register, login and typing in product information, and realize intranet or remote control.
- It can realize data output, printing, analyzing requirements to improve product quality.
Application
Applications of Autoclave Laminated Glass in Automobiles and Construction, Automotive windshields
Although glass may be seen as a delicate and fragile material, its primary use for over 100 years has been in windshields, precisely one of the safest and most reliable elements we need in our lives.
Furthermore, it is an element that has remained virtually unchanged since its invention, as laminated glass perfectly fulfills its purpose of protecting both the occupants of the vehicle and pedestrians. Laminated glass in windshields, along with seat belts, is the most important invention ever related to driving.
Company Profile
Changzhou SINOMAC Machinery Technology Co. Ltd. is located in the hometown of autoclave, Changzhou, Jiangsu Province. It is specialized in providing energy efficient autoclave, corollary equipments for production line, and projects of intelligent production. The autoclave developed and produced by our company is in a leading role in domestic market, and it is widely used in many different areas, such as composites curing, safety glass laminating, photovoltaic module encapsulation, wood carbonization, rubber vulcanization, industry chemicals synthetisis, and so on.
We focus on satisfying different needs from global customers. All the products can be produced according to ASME, PED, AD-2000 standards, and we will also provide relevant certificate and code to make sure its quality and safety. At present, our autoclave has been sent to America, Canada, Russia, Australia, New Zealand, France, Brazil, Venezuela, Saudi Arabia, India, Vietnam and Tunis.
We are concerned of the added value of customer's future use, manufacturing human and intelligent equipment, and we always try our best to meet customer's demands, and provide best service on the basis of customer's investment maximization. At the same time, we also focusing on the stability, efficiency, and energy-saving of products to make sure customer can get a stable, sustainable, and profitable business growth from the investment in our equipment.
Certifications
Packaging & Shipping
FAQ
Are you factory or trading company?
We are factory located in Changzhou City, Jiangsu Province, China
Installation
The installation and commissioning takes 1 person x 15 days (max.) under the Buyer's assistance.
The following installation work shall be included:
The installation of the whole electrical system (Only between the equipment electrical cabinet and autoclave), not including the main power of customer's.
The guidance of pipe-line installation for the whole equipment.
Equipment pipe-line installation shall be done by a third party who has the pressure vessel installation certificate in local place, customer bearing the extra cost.
Production training is carried out during the same period.
The international travelling cost, including round-trip air tickets, insurance, boarding and meals of the Seller's service team should be charged to the buyer.
The buyer should pay 150USD/day for the engineer as the installation fee.
Quality Guarantee
The Seller provides 14 months quality guarantee, during which the Seller is responsible for all equipment
failures due to inferior quality, improper design or services.
Delivery Period
The delivery period is 90 working days after receiving down-payment; but does not include transportation and installation time!
Payment
T/T